ATP Hardware installs can take 2-4 hours just unboxing the components and another 2 doing wire management in certain situations some of these items could be unboxed and put into the following;
ATP2- add wire hiding channels preinstalled on frame, add hub, switch preinstalled in the rear of the unit or into add on add on frame if available. add scanner cradle to the ATP2 client, customers hate the Velcro and it fails constantly.
ATP2 add on frame- put bolts in same location each time attached to frame or put them in the tool box. All of the Client station items in one box mark that box appropriately , same goes for Workstation, ULT, etc.
Add multiple networking cable lengths 2 each of 6, 15 , 25 in a box along with wire management components, also add cord hiders for networking cables on customer wall, using a 10ft cable for a patch 2ft away creates a messy look for the customer experience.
The newer monitors have an different neck design which forces the thin clients to be underneath the monitor, look into under desk mounting brackets to clean up this look this is a suggestion from multiple customers.