Removing the UPS through the top of the MAX for replacement is time consuming and difficult. There is ample room to move the cable track to the top of the frame. Then the UPS can be laid on it's side and slid in from the front of the machine. It also makes the power buttons on the front of the UPS more easily accessible for the customer. Once laid on it's side it only requires the removal of the front cover to remove and either replace UPS or replace batteries. As an added benefit it is safer for the FSE to slide the UPS in from the front of the MAX rather than lifting it over the top of the frame and setting it into place.
This is not an IoT request. Please add to Max idea portal.